Bid Opportunities & Results

Bookmark and Share

You will find bid opportunities and consultant requests for a variety of initiatives and construction projects listed below as well as recent results. Sign up for the RSS feeds to automatically receive notification of a new posting. For further information, please contact the Office of Contracts and Procurement at CRAAProcurement@columbusairports.com. Please visit the Real Estate section to learn about food, beverage and retail business opportunities.

Opportunities
Due Date Title RSS
10-19-2017 AD FOR BIDS: ESCALATORS 1-12 AND F REPLACEMENT AT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT-CONSTRUCTION SOLICITATION NO. ENG-2017-003 (pdf)
The work consists of total removal of existing specified escalators equipment, machinery and framing. Fabrication and installation of new escalator equipment, machinery and framing in same locations. This replacement involves multiple phasing including finished drywall barricades on all escalators locations. The engineer� estimate for this project is: $4,130,000.00.
10-19-2017 ADDENDUM NO. 1: INTERIOR DESIGN SERVICES SOLICITATION NO. AMT-2017-002 (pdf)
10-19-2017 ADDENDUM NO. 1: SPACE PLANNING SERVICES SOLICITATION NO. AMT-2017-003 (pdf)
10-19-2017 ADDENDUM NO. 2: INTERIOR DESIGN SERVICES - COMMERCIAL SOLICITATION NO. AMT-2017-002 (pdf)
10-19-2017 ADDENDUM NO. 2: SPACE PLANNING SERVICES - COMMERCIAL SOLICITATION NO. AMT-2017-003 (pdf)
10-19-2017 REQUEST FOR QUALIFICATIONS: INTERIOR DESIGN SERVICES SOLICITATION NO. AMT-2017-002 (pdf)
10-19-2017 REQUEST FOR QUALIFICATIONS: SPACE PLANNING SERVICES SOLICITATION NO. AMT-2017-003 (pdf)
10-26-2017 AD FOR BIDS: AFM VEHICLE STORAGE BUILDING CEILING AT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT SOLICITATION NO. AFM-2017-002 (pdf)
The work consists of new ceiling for a 31,200 SF warehouse. The estimate for this project is: $267,000.
10-26-2017 AD FOR BIDS: HANGAR 596 EQUINE FACILITY UPGRADES AT RICKENBACKER INTERNATIONAL AIRPORT SOLICITATION NO. ENG-2017-025 CONSTRUCTION (pdf)
The work consists of misc. demolition, drainage structures and storm sewer pipe, electrical, plumbing, HVAC, sprinkler modifications, masonry, concrete, painting, and doors. The engineers estimate for this project is: $635,690.25.
11-02-2017 AD FOR BIDS: ID OFFICE RENOVATION AT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT-CONSTRUCTION SOLICITATION NO. ENG-2017-029 (pdf)
The work consists of renovation and reconfiguration of three (3) locations in the airport: ID Office (primary), TSA Breakroom (secondary), and Room 112 (secondary). The ID Office consists of remodeling and reconfiguration of the entire office including demolition of specified walls, install new walls, patch, paint and repair walls, new flooring and millwork. TSA Breakroom consists of relocation of TSA Breakroom, including demolition of walls, ceiling reconfiguration, paint, patch and repair walls and new flooring. Room 112 consists of demolition, new wall, and ceiling reconfiguration. Project is expected to be MULTI-PHASE where EVENING and WEEKEND WORK HOURS are anticipated for critical phases of the project. Alternate No. 1 consists of replacement of existing suspended ceiling grid, lighting, flooring and patch, paint and repairs to walls in Room 111. The engineers estimate for this project is: Base Bid - $275,775.00; Alternate No. 1 - $18,317.00.
11-02-2017 REQUEST FOR PROPOSALS (RFP): QUARTERLY & ANNUAL LIFE SAFETY INSPECTIONS, REPAIRS & PARTS ; SOLICITATION NO. AFM-2017-007 (pdf)
See attached file for the RFP.
11-16-2017 REQUEST FOR QUALIFICATIONS: ON-CALL AIRSIDE PLANNING SERVICES SOLICITATION NO. PLN-2017-002 (pdf)
Bid Results
Date Title RSS
10-12-2017 PROPOSALS RECEIVED: PURCHASE OF NEW OR DEMOLITION, REFURBISHMENT, AND/OR RELOCATION OF PASSENGER BOARDING BRIDGES SOLITICITATION NO. FAC-2017-003 (pdf)
09-21-2017 PROPOSALS RECEIVED: REQUEST FOR PROPOSALS: ANNUAL GENERATOR INSPECTIONS AND REPAIRS ; SOLICITATION NO. FAC-2017-006 (pdf)
See attached file for the list of proposals received.
09-21-2017 SHORT-LIST DETERMINATION: TERMINAL CAPACITY, AIRLINE AND CONCESSION IMPROVEMENT PROJECTS AT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT SOLICITATION NO. ENG-2017-022 (pdf)
See attached file for the Short-Listed firms.
09-20-2017 PROPOSALS RECEIVED: REQUEST FOR PROPOSALS (RFP) #BD-2017-003: TICKET LOBBY CENTER VIDEO WALL AND TWO (2) FLIGHT INFORMATION DISPLAY SCREENS (FIDS): EQUIPMENT AND REMOVAL/INSTALLATION SERVICES (pdf)
See attached file for a list of proposals received.